Scope of work

   South China building materials has been engaged in interior decoration project for six years since          2004. We work happily,With the enterprise spirit of integrity, hard work and continuous ...

         The scope of the process is generally as follows:

华南建材从2004年从事内装总包工程,已走过了6个年头。我们本着快乐工作,诚信立业,用心做事,不断超越的企业精神,努力完成每一个总包工程。总包工

程的范围一般为:

Supply and installation of cabin furniture
Supply and installation of cabin furniture
Supply and installation of deck dressing
 Supply and installation of deck dressing
Supply and installation of composite rock wool board
 Supply and installation of composite rock wool board
Supply and installation of insulation materials for the whole....
Supply and installation of insulation materials for the whole....
Stainless steel handrail works for indoor walkways and stairways of the...
Stainless steel handrail works for indoor walkways and stairways of the...
Supply and installation of window bucket, curtain, bed curtain...
Supply and installation of window bucket, curtain, bed curtain...
Supply and installation of floor materials (PVC floor, rubber floor
Supply and installation of floor materials (PVC floor, rubber floor
Cleaning and protection of ship cabins
Cleaning and protection of ship cabins
Supply and installation of cabin hardware
Supply and installation of cabin hardware
Supply and installation of various picture frames and key boxes
Supply and installation of various picture frames and key boxes

Engineering advantages

Reasonable form of project management
Reasonable form of project management
Reasonable form of project management

The company organizes the project management team of interior decoration engineering headed by the project manager to comprehensively monitor, direct and coordinate the construction process of ship interior decoration, so as to ensure that the construction safety, project quality and project progress are always under control. Externally, the company is responsible for coordinating the ship owner, ship inspection and shipyard, and internally coordinating the supervisors, so as to ensure the normal

Rigorous project safety planning
Rigorous project safety planning
Rigorous project safety planning

Under the guidance and management of the general contractor and the shipyard, 'three-level education' will be conducted for all the shipboard management and construction personnel of our company, as well as the education of safety operation procedures

Strict project quality control
Strict project quality control
Strict project quality control

According to IS09001-2000 quality management system specifications and standards, the quality policy and quality objectives of the project are determined, the quality plan is prepared, and the self inspection, mutual inspection and special inspection system are strictly implemented in the construction 

Efficient construction team
Efficient construction team
Efficient construction team

According to the determined on-site management organization, establish the project construction management, and efficient construction team to carry out the installation of the project. 

Engineering case

Relying on the strong resource advantages of the group, HBM has built a comprehensive operation platform integrating R & D, design, production, sales and internal installation project...